中文版 英文版 日文版

Sweep and see

Fax: 86-513-85986161
E-mail:
qianjing@xiongfeng-group.cn
Address: 28 Fuxing Road, Nantong Development Zone, Jiangsu Province, China

86-513-83591111

Copyrights © 2019 Nantong Xiongfeng Internation Economic and Trade Co.,Ltd. ALL RIGHTS RESERVED. 苏ICP备2022019015号 Powered by www.300.cn

HOTLINE

NEWS CENTER

Knitting ribbed semi-finished product inspection process

Page view
[Abstract]:
1. Require the inspector to check the process, the needle, the number of revolutions, the length of the piece, the length of the rib, the density uniformity, the missing needle, the hanging edge, the monofilament, the color difference, the sill yarn, and the dirty work. Check for defects (repair the defects that can be processed)

2. After the formed piece is removed from the machine, the density inspection, size, and pattern conformity should be performed in time.

3. Record the weight of the single piece. (If there are more than 2 types of color matching, detailed recording of each color is required)

4. Before the inspection, the pieces are pulled in different directions due to weaving, and should be retracted by the ruler.

1. Require the inspector to check the process, the needle, the number of revolutions, the length of the piece, the length of the rib, the density uniformity, the missing needle, the hanging edge, the monofilament, the color difference, the sill yarn, and the dirty work. Check for defects (repair the defects that can be processed)

2. After the formed piece is removed from the machine, the density inspection, size, and pattern conformity should be performed in time.

3. Record the weight of the single piece. (If there are more than 2 types of color matching, detailed recording of each color is required)

4. Before the inspection, the pieces are pulled in different directions due to weaving, and should be retracted by the ruler.

Next article: